especially for the chemical industry
to gas detector calibration
with extended explosion protection
for level measurement
for high-speed material handling
is ready for series production
offering full backward compatibility
for Norwegian Goliat FPSO project
made of titanium
of water pumping stations
in stainless steel design
to build a CO2 concentration unit
in hazardous areas
in orange juice
environmental processing of waste
with EHEDG certification
The largest crane system constructed to date by J D Neuhaus has been delivered to Westcon Lofteteknikk AS (WCL) of Norway for use on an offshore drilling rig. The semi portal design comprises an A-frame supporting twin overhead horizontal track beams providing a 7.5 metre span.The crane has an approximate height of 11.5 metres with a total weight of 32 tonnes. It is equipped with JDN hydraulic EH 40-H...
for CO2 concentration, temperature and humidity
aluminium foundry offers time savings of up to 15%
from CJV for Arrow LNG project
on main markets in North and South America
– still an explosive topic
in asbestos decontamination units
in new whisky bottling plant
- extreme requirements
for gas plant
and visualisation for a mill
Prevention better than protection
in one pass
cuts WAG system costs
combines visible and audible signals
for the smallest of spaces
with Non-invasive ultrasonic flow meters
air operated, DN010-DN050
feature protective collars
building in the Netherlands
for harsh applications
simplifies sludge removal at salt producer
with integrated RFID solution
with distributed responsibilities
Digital Edition Download PDF